Dear colleagues, partners!

This section presents the technical and technological tasks of the enterprises of the companies of the Samruk-Kazyna JSC Fund group with a description. To search for their scientific, technical, innovative and technological solutions, research institutes, universities, research laboratories, and technology companies are invited to cooperate. You can send us your scientific developments, innovative solutions in the form of a brief presentation of your technology.

You can send your suggestions to: y.mazbayev@csti.kz, z.zhumadilova@csti.kz or info@csti.kz

The list of technological tasks:

  1. Reduction of high noise level at the Sulphur Regeneration Plant
  2. Cooling of gas and solutions on air coolers
  3. Control of mechanical contaminants during water treatment and injection.
  4. Utilization of waste-free gas treatment technology 4.
  5. Maintaining and increasing low reservoir pressure, which is below bubble point pressure
  6. Selecting a formulation for acid fracturing operations
  7. Selection of shut in fluid for well workover operations
  8. Selection of formulation of fluids of WSO/conformance technologies for carbonate reservoirs
  9. Insinerator (afterburning furnace) verticality recovery
  10. Reduction of CO2 emission into the atmosphere
  11. Hydraulic calculation of oil and gas gathering system
  12. Throughput capacity of the collector through the culvert (under river pass)
  13. Corrosion at the Gas Treatment Plant due to vapor-gas mixture
  14. Fuel gas after-drying
  15. Selection of mechanized method of operation at wells with stepped intermediate casing (exploration)
  16. Optimization of existing methods of combating complications and introduction of progressive technologies that minimize the impact of negative factors in hydrocarbon production
  17. Pumping fluids for workover operations
  18. Inter-column pressure
  19. Improving the quality of injection water treatment from water production wells along with backproduced water in the system of reservoir pressure maintenance
  20. Cleaning wells from proppants after hydraulic fracturing
  21. Replacing the flowing gate valve on the well, without shut in the well
  22. Utilization of excessively generated electricity from a gas turbine station